RAILWAY MAINTENANCE FOR MUD HOLES

Mud Holes, or Bog Holes have become a speciality for Onrail over recent years. Onrail have all the major and minor plant, along with experienced staff to complete these works completely in-house.

Our Plant Operators, Labourers and Track Certifiers all work together to deliver quality results; safely and efficiently during track possessions to assist in the maintenance of the permanent way.

Railway Maintenance For Mud Holes

At Onrail, we are experts at removing and rectifying mud and bog holes, delivering an unparalleled service. Working effectively and efficiently, we own and operate all the required major and minor plants to remove dangerous mud holes, completely in-house.

Learn More

Undercutting Infratructure

With two 2014-model undercutting units owned and operated by Onrail, we are proven to provide productive onsite service. Fitting to 13-tonne excavators, the units are powerful, delivering complete work packages in-house.

Learn More

Resleepering

We have established ourselves in the industry, and made a name for ourselves, by completing extensive resleepering tasks. Highly experienced in construction and reconstructions of tracks, our operators use steel, concrete, timber and polymer sleepers to great effect.

Learn More

Rail Drainage

With extensive experience in drainage and cable route installation, Onrail has worked on and off track to produce a great outcome.

Learn More

Civil Works

We have the capacity and capability to work on a large variety of projects, both on the tracks and off. We can complete any of your tasks using our fleet of excavators and loader attachments.

Learn More

Transporting Goods

Our fleet of trucks move our equipment between projects. Insured to carry third party equipment, our trucks and drivers can be hired to relocate your plant and equipment to another location, wherever you are going in Australia.

Learn More

Have a project in mind?

Reach out to one of our project managers today! 

our clients

Civil

  • Subdivision construction
  • Hunter Football stadium
  • Fire trails for NPWS
  • Embankment Widening Projects
  • Drainage and Trenching Project

Rail

  • Our Plant designed primarily for resleepering projects
  • We own some of the industry’s top equipment
  • We provide a complete solution
  • Railroad contractors with an industry leading advantage
  • Under cutting and Ballast cleaning
  • Mudhole ,Bog Hole removal and remediation
  • Track formation & Resleepring Project
  • ULX & UHSC job in Rail corridor

Construction

  • Onrail has the plant and qualified operators to completely deliver packages
  • Industrial and Residential construction

Contact


(02) 9627 6112
accounts@onrail.com.au
www.onrail.com.au
26 Princess Sreet,
Riverstone NSW 2765

Copyright 2019 On Rail Plat Hire Pty Ltd | Designed By Dweebi