Undercutting Infrastructure

Onrail own and operate two 2014 model undercutting units. These units fit to our 13t excavators and have consistently proved to be extremely productive onsite.

Onrail has the plant and qualified operators to completely deliver packages of work in-house. To date Onrail have delivered a number of significant undercutting projects in the Hunter Valley using our under-cutters, loaders, 5t and 8t excavators and Hirail dumpers, along with our track certifiers to improve track drainage and maintain track alignment and top.

Railway Maintenance For Mud Holes

At Onrail, we are experts at removing and rectifying mud and bog holes, delivering an unparalleled service. Working effectively and efficiently, we own and operate all the required major and minor plants to remove dangerous mud holes, completely in-house.

Learn More

Undercutting

With two 2014-model undercutting units owned and operated by Onrail, we are proven to provide productive onsite service. Fitting to 13-tonne excavators, the units are powerful, delivering complete work packages in-house.

Learn More

Resleepering

We have established ourselves in the industry, and made a name for ourselves,by Completing extensive resleepering tasks. Highly experienced in construction and reconstructions of tracks, our operators use steel, concrete, timber and polymer sleepers to great effect.

Learn More

Rail Drainage

With extensive experience in drainage and cable route installation, Onrail has worked on and off track to produce a great outcome.

Learn More

Civil Works

We have the capacity and capability to work on a large variety of projects, both on the tracks and off. We can complete any of your tasks using our fleet of excavators and loader attachments.

Learn More

Transporting Goods

Our fleet of trucks move our equipment between projects. Insured to carry third party equipment, our trucks and drivers can be hired to relocate your plant and equipment to another location, wherever you are going in Australia.

Learn More

Have a project in mind?

Reach out to one of our project managers today! 

Civil

  • Subdivision construction
  • Hunter Football stadium
  • Fire trails for NPWS
  • Embankment Widening Projects
  • Drainage and Trenching Project
  • Council works Asset Management
  • TSFNSW - Road works, asset Management
  • All Aspects of civil excavation.

Rail

  • Our Plant designed primarily for but not limited to;
  • re sleepering projects.
  • Undercutting of mudholes.
  • All aspect of drainages works.
  • Ballast cleaning
  • Shear Keys,
  • Skim recons,
  • Platform upgrades, 
  • We provide a complete solution
  • Railroad contractors with an industry leading advantage
  • Track formation
  • ULX & UHSC job in Rail corridor

Construction

  • Onrail has the plant and qualified operators to completely deliver packages
  • Industrial and Residential construction
  • ISO Accredited in Safety, Environment, Quality.
  • Over 40 years experience.

Contact

Head Office
(02) 9627 6112
info@onrail.com.au
www.onrail.com.au
26 Princess Sreet,
Riverstone NSW 2765

Hunter Valley Branch

(02) 4937 6626
info@onrail.com.au
www.onrail.com.au
89 Kyle Sreet,
Rutherford NSW 2320

Copyright 2019 On Rail Industries Pty Ltd | Designed By Dweebi